Scott Wilson has managed the replacement of Pacific Steel’s equipment without impacting on production.
Upgrading Pacific Steel’s aging infrastructure became a priority after the existing switchgear failed, causing severe damage and a costly loss of production. What’s more, the plant’s transformer was also reaching the end of its functional life.
As loss of production is such an important issue, the transformer change-over took place during the Christmas shutdown and required a high level of coordination from Ergo, Knowles Consulting (Civil Engineers), Vector, Pacific Steel, Brian Perry (Civil Contractor) and Northpower (Electrical Contractor) for the provision of labour and equipment.
“The changeover went smoothly and the Pacific Steel plant was able to restart on time,” says Scott.
Installation details:
In November 2011 the IPENZ Standards & Accreditation Board accepted Ergo's application as a Professional Development Partner (PDP). There are currently only 35 other companies which hold this accreditation.
read more >
PO Box 9717
Newmarket
Auckland 1149
Level 1, 106 Carlton Gore Road
Newmarket
Auckland 1023
Ph: +64 (9) 365 9700
Fax: +64 (9) 365 9701