This was a greenfield project required over a short time period. Scope involved a full hardware design documentation package and liaison with PLC automation engineers and site installers. Works involved 22 motors, some with synchronisation, and category 3 safety isolation.
read more > talk to someone >This required a complete electrical hardware design for Wastewater Pump Station upgrades at Waitangi, Haruru Falls, and Kaitaia. Existing fixed speed pumps were converted to variable frequency drives, supplied and controlled from new switchboards and control systems.
read more > talk to someone >The raw water pump station for Hamilton City's Water Treatment Plant was recently upgraded. This project required a new switchboard to replace the existing switchboard, complete with four 200kW motors all of which were VSD controlled. The upgrade was recently completed in a staged manner with minimal disruption to the process.
read more > talk to someone >Steve Rhind is working to provide the Hamilton City Water Treatment Station with Standby Diesel Generation thus enabling the facility to operate in the event of a loss of electrical supply.
read more > talk to someone >Dima Ibrahim worked with United Group Ltd and AWT on Queenstown Lakes District Council’s new Wastewater Treatment Plant at Wanaka.
read more > talk to someone >The stakes were high: get it wrong and sixty per cent of a large city’s water supply could dry up. Careful planning and a thorough approach meant that a water treatment plant’s raw-water dosing system upgrade went without a hitch.
read more > talk to someone >The stakes were high in an electrical upgrade project that affected at least 80 per cent of a major New Zealand metropolitan water supply.
read more > talk to someone >Chris Turney and University of Auckland's Dr.Nirmal Nair presented their views on 'Black Box' Generation at this years EEA Conference.